
Saint-Cyr-au-Mont-d'Or, 2025
House among the vines
A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.
Timber frame, larch cladding, wood fibre insulation
11 months on site

Restoration of old buildings
Farmhouses, village houses, barns and old town buildings. We read the building before drawing anything, then adapt it to the way you live, with the materials it was made of.
An old building has been repaired many times. The survey says what holds, what has been weakened, and what the rules will ask of the project.
Which walls carry, which have been cut, where the cracks come from.
Where the water rises or runs, and why cement render often makes it worse.
What the walls are made of, and which render lets them breathe.
The state of the timbers, the covering, and what an attic conversion would need.
What can be repaired, what must be replaced, and in which material.
Near a listed monument, the Architecte des Bâtiments de France gives an opinion and the review takes longer.

Saint-Cyr-au-Mont-d'Or, 2025
A 142 m² family house on a sloping plot, set into the ground to the north and wide open to the south.
Timber frame, larch cladding, wood fibre insulation
11 months on site

Lozanne, 2024
A farmhouse brought back to life: lime render, oak joinery and a barn turned into a living room.
Rubble stone, lime render, oak joinery
9 months on site

Caluire-et-Cuire, 2025
A 38 m² kitchen and dining room opening onto the garden, under a building permit.
Steel frame, full-height glazing, reclaimed brick
6 months on site
From the survey of the existing building to the supervision of the craftsmen. Fees are set in a written contract.

Before you buy a plot or commit to works: what the planning rules allow, a first sketch and a realistic budget.
2 to 4 weeks
Drawings, insertion images and forms: a complete application, filed and followed until the decision.
4 to 8 weeks, plus the review
From the first sketch to the handover of the keys: design, permit, choice of builders and supervision of the works.
12 to 20 months
Opening up, raising, extending or bringing an old house up to date, with the structure checked before anything is knocked down.
6 to 14 months
Weekly visits, written minutes, checks on invoices: someone on your side while the builders work.
the length of the works
Redesigning a flat or a house from the inside: layout, light, materials and made-to-measure joinery.
2 to 6 months
The building is measured and examined, with the structural engineer when needed.
Plans, materials and cost, worked out with you, in phases if you live in the house.
Planning declaration or permit, and the opinion of the heritage architect in a protected area.
Masons, roofers and joiners who know lime and old timber, priced on the same specification.
A visit every week, then a written handover. The guarantees start that day.
They took out the cement render that was trapping the damp. Two winters later, the walls are dry.
The barn kept its beams and its stone. It is now the room where we spend our evenings.
The heritage architect's opinion was favourable the first time: the file had answered every question.
Its address, its age if you know it, and what you would like to do. A few photos of the facades and the roof help a lot: send them by email after this message.
By phone
04 78 00 11 22